New Build / In Screed
For new slabs, extensions and major renovations where the heating pipe can be designed into the screed construction.
Currently closed
Water underfloor heating solutions
Start with the way your floor is being built, then compare the systems designed for that construction.
Whether you are working with a new screed, upgrading an existing floor or heating a suspended timber construction, the right system depends on the available build-up, floor finish, heat loss and heat source.
Choose by floor construction
Choose the floor you are creating or retaining, then compare the suitable systems below.
For new slabs, extensions and major renovations where the heating pipe can be designed into the screed construction.
Low-profile systems fitted over a suitable existing floor where avoiding excavation and controlling build-up are important.
Systems designed around timber joists, insulation, structural loading and the floor deck above.
Water underfloor heating advice
Common questions about choosing water underfloor heating for your floor construction.
An in-screed system is often the natural starting point when the floor construction is still being designed. AD-CLIP, AD-RAIL and AD-TRAY offer different pipe-fixing approaches; the project design should confirm the final route, pipe spacing, screed and circuit layout.
A low-profile overlay system may avoid excavating the existing structural floor. The best option depends on the condition of the base, available finished height, heat loss and floor covering—not simply the panel thickness.
Yes. A project may combine in-screed, overlay and timber-floor systems across different areas. The heating design should coordinate the circuit outputs, water temperatures, manifolds, controls and floor-finish limits.
Water underfloor heating can work very effectively with a correctly designed heat-pump system. The room heat loss, flow temperature, pipe layout, floor finish and controls must be assessed together to confirm the required output.
No. Panel thickness is only one layer. Primers, adhesives, underlay, overboarding, levelling compounds and the final floor covering all contribute to the finished build-up.
Provide dimensioned plans, room uses, floor constructions, insulation, available build-up, proposed coverings, heat source and manifold location. A heat-loss assessment can then be used to confirm the suitable system and circuit design.