How to Connect and Fill an Underfloor Heating Manifold
Connect each matching flow-and-return pair, then fill and purge every circuit individually through the manifold.
Once the circuits have been laid, trapped air must be removed before the completed installation is pressure tested. Manifold layouts and connectors vary, so always follow the instructions for the installed equipment.
Match and connect every flow-and-return pair, close the primary isolation valves, then fill and purge each circuit separately through the manifold before pressure testing.
1
Match the Circuits
Pair and label every flow and return.
2
Use the Correct Connectors
Prepare and connect each pipe correctly.
3
Close Primary Isolation
Isolate the manifold from the heat source.
4
Fill Through the Manifold
Use the designated fill and drain points.
5
Open One Circuit
Keep every other flow-and-return pair closed.
6
Purge Until Air-Free
Continue until discharge is steady.
7
Pressure Test
Test before covering any pipework.
Prepare before starting
What You Will Need
Gather the correct tools, connectors, hoses and project information before opening the water supply.
A suitable pipe cutter
The correct calibration or re-rounding tool, if required
Specified manifold connectors and inserts
Suitable spanners
A filling hose and drain hose
An approved filling-water connection
A safe and suitable drain point
The manifold instructions
The system design or loop schedule
Cloths or a shallow tray
1
Identify and label
Identify the Underfloor Heating Circuits
Each circuit has a flow and return end. Confirm which two pipe ends belong to each room or heating zone before making any connections.
Label every circuit clearly at the manifold. This makes filling, pressure testing, balancing and future maintenance considerably easier.
2
Make the connections
Connect the Pipes to the Manifold
Use the connector specified for the pipe size, pipe construction and manifold connection. Repeat the sequence for every circuit, ensuring each flow and return is connected to the correct port.
Cut the pipe squarely using a suitable pipe cutter.
Check that the end is clean, round and undamaged.
Re-round or calibrate the pipe if required.
Fit the connector components in the correct order.
Insert the pipe fully into the manifold adaptor.
Tighten the connection to the manufacturer’s instructions.
3
Before introducing water
Prepare the Manifold for Filling
Switch off the heat source and circulation pumps.
Close the primary flow and return isolation valves.
Close the flow and return valve for every circuit.
Keep the fill and drain valves initially closed.
Follow the instructions if actuators have already been installed; manual caps may be needed temporarily.
Connect the filling hose to the specified manifold fill point.
Connect the drain hose to the specified point and secure it at a suitable drain.
Approved filling connection→Selected circuit→Safe drain point
Do not fill the underfloor heating circuits through the boiler or heat source. Fill and purge through the manifold using the approved arrangement.
4
One loop at a time
Fill and Purge One Circuit at a Time
Filling circuits separately gives the air in each loop a direct route to the drain. Opening several circuits together can let water take the easiest route while leaving air trapped elsewhere.
Open the manifold fill and drain valves.
Open the first circuit’s flow control or flow meter.
Open the matching return valve.
Leave every other circuit closed.
Introduce water through the filling connection.
Allow it to travel around the entire circuit and discharge through the drain hose.
Continue until the discharge is steady and free from visible air.
Close both valves for the completed circuit and repeat for every remaining loop.
Air removal
How Do I Know When a Circuit Is Fully Purged?
Water flows continuously from the drain hose.
There is no visible stream of bubbles.
The discharge no longer splutters or stops.
The flow remains steady for a short period.
5
After every circuit is purged
Complete the Filling Process
Turn off the filling supply.
Close the manifold fill and drain valves.
Release pressure in the temporary hoses safely.
Disconnect and remove the hoses.
Refit the manifold’s fill and drain caps.
Set the circuit valves for the pressure-test procedure.
Inspect every connection and manifold joint for leakage.
PT
Filling Is Not the Same as Pressure Testing
Removing air does not confirm the installation is leak-free. Complete a separate hydraulic pressure test using the procedure and pressures specified for the installed pipe and manifold before covering the circuits with screed, boards or the final finish.
Record the results and keep them with the system documentation.
FR
Do Not Balance the System Yet
Flow meters may be opened for filling, but these are not the final settings. Apply the designed flow rates only after the system is completely filled and vented, pressure tested, connected to the heat source, commissioned and circulating normally.
Use the system design—not room-size estimates.
Avoid preventable problems
Common Mistakes to Avoid
Most filling problems come from an incomplete flow path, unsuitable connections or treating air removal as the final system test.
×
Filling Every Circuit at Once
Water can bypass more resistant circuits and leave trapped air. Purge one circuit at a time.
×
Filling Through the Boiler
The boiler filling loop cannot purge individual floor circuits. Use the manifold fill and drain points.
×
Leaving Primary Valves Open
Water and displaced air may enter other parts of the system instead of following the selected circuit.
×
Mixing Up Circuit Pairs
An unrelated flow and return do not form the intended loop. Label and verify every pair.
×
Using the Wrong Connectors
Use only connectors and inserts approved for the installed pipe dimensions and manifold.
×
Overtightening Connections
Excessive force can damage the connector, pipe or manifold. Follow the fitting instructions.
×
Skipping the Pressure Test
A system can fill correctly and still contain a leaking or incorrectly assembled connection.
Manifold filling questions
Frequently Asked Questions
Clear answers about hoses, valves, actuators, trapped air and the difference between filling and commissioning.
Can I fill all the underfloor heating loops together?
No. Fill and purge each circuit separately while the other circuits remain closed. This ensures water passes around the full length of the selected loop and carries trapped air to the drain.
Can I fill the manifold through the boiler?
No. The underfloor heating circuits should be filled and purged through the manifold’s designated fill and drain points.
Which manifold rail should the filling hose connect to?
This depends on the manifold. Use the fill and drain connections identified in the manufacturer’s instructions. Do not rely on rail position, cap colour or a photograph of another model.
Do the actuators need to be removed?
That depends on the actuator and manifold arrangement. They may need to be removed and replaced temporarily with manual caps so each return valve can be controlled independently. Follow the installed manifold instructions.
Why is air removal so important?
Trapped air can restrict circulation, create noise and prevent individual circuits from heating correctly. Each loop should produce a steady, air-free discharge before it is closed.
What should I do if a circuit will not fill?
Confirm that both valves for the selected circuit are open, every other circuit is closed and the fill and drain valves are open. Check for kinked hoses, restricted pipework or an incorrectly assembled connector. Stop and consult a competent installer if the cause is unclear.
Is filling the system the same as commissioning it?
No. Filling and purging remove air from the circuits. Pressure testing, connection to the heat source, electrical checks, balancing and operational checks are separate commissioning stages.
Before covering the pipework
Next Step: Pressure-Test the System
Once every circuit is filled and fully vented, the installation must be hydraulically pressure tested. If you are unsure about the manifold arrangement or test procedure, speak to the Uheat technical team.