New Build / In Screed
For new slabs, extensions and major renovations where pipework can be installed within the screed.
Currently closed
Water underfloor heating
Start with how your floor is being built. We’ll guide you to the right system for new builds, renovations and timber joisted floors.
Choose by floor construction
Choose the option that best matches your project. You can compare the details before making a final decision.
For new slabs, extensions and major renovations where pipework can be installed within the screed.
Popular for renovations
Low-profile systems fitted over an existing structural floor when floor height needs to stay controlled.
Systems designed for suspended timber floors and upper levels, fitted between or across the joists.
| Comparison criteria | In Screed | Overlay | Timber Joisted |
|---|---|---|---|
| Starting point | New concrete slab or structural screed | Existing solid floor, screed or timber deck | Suspended timber floor or upper level |
| System position | Embedded within the screed | Over the existing floor, beneath the finish | Between or across the timber joists |
| Main priority | Build in once for long-term efficiency | Low build-up and minimal disruption | A lightweight solution that respects the structure |
Plan the complete system
Each project combines the floor system with distribution, controls and the correct supporting build-up.
Supports response, efficiency and the finished floor
Pipework and the floor construction system
Distributes water and controls each zone
Thermostats and wiring for comfortable control